Ho Bon Hydropower Project
#1462of 1935 in Renewable energy#71of 80 in Vietnam#1210of 1459 in CDM (UNFCCC)#1118of 1287 in ACM0002
Audit Analysis
The Ho Bon Hydropower Project is a small-scale CDM hydropower avoidance project in Vietnam with VVB-confirmed additionality and a jurisdictional grid baseline, but the available record is limited to validation-stage documents with no monitoring reports, low extraction confidence, and a significant 7× discrepancy between the PDD's claimed emissions and the VVB-validated figure. Multiple material findings and corrective actions at validation indicate the project design required substantial revision before registration.
Red Flags
- PDD claimed 302,995 tCO2e while the VVB validation report validated only 43,285 tCO2e — a 7× over-claiming in the project proponent's document that was corrected by the VVB
- Four corrective action requests and three clarification requests were raised in the validation report, including errors in emission factors, project start date, and stakeholder meeting documentation
- No monitoring reports or verified emissions data are available in the extracted record; the project's actual performance over its 2011–2017 crediting period cannot be assessed
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable or incomplete
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deemed negligible, reasonable for hydro
Jurisdictional grid EF (0.602, 2007)
Mentioned but FPIC and grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →