Homet Raya Sibu Biomass Cogeneration Power Plant Project
#191of 352 in Biomass#14of 16 in Malaysia#1211of 1459 in CDM (UNFCCC)#28of 81 in ACM0006
Audit Analysis
A CDM biomass cogeneration project (Malaysia, 2011–2017) with a VVB-confirmed investment additionality test and a detailed validation report, but critically lacking any monitoring or verification data to confirm its 407,334 tCO₂e lifetime claim. The 0% leakage deduction rests on a thin 'deemed negligible' justification, feedstock sustainability is unverified, and three corrective actions required the project to establish basic operational procedures before crediting could proceed.
Red Flags
- No monitoring reports or verification reports are available in the extracted record; the 407,334 tCO₂e lifetime claim cannot be independently confirmed against actual performance.
- Leakage deduction of 0% is justified only as 'deemed negligible' with no quantified analysis, which is thin for a biomass project where displaced fuel or alternative biomass use could generate leakage.
- Feedstock sustainability, carbon content testing, and usage monitoring method are all absent from the available documents, leaving the biomass supply chain unverified.
- Three corrective actions (CARs) required the project to establish procedures for emergency preparedness, monitoring, records handling, and corrective actions before operations could proceed, indicating initial operational readiness gaps.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Energy project, no reversal risk
0% deduction, thin justification
Project-specific, no reassessment data
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →