A CDM biomass cogeneration project (Malaysia, 2011–2017) with a VVB-confirmed investment additionality test and a detailed validation report, but critically lacking any monitoring or verification data to confirm its 407,334 tCO₂e lifetime claim. The 0% leakage deduction rests on a thin 'deemed negligible' justification, feedstock sustainability is unverified, and three corrective actions required the project to establish basic operational procedures before crediting could proceed.

Red Flags

  • No monitoring reports or verification reports are available in the extracted record; the 407,334 tCO₂e lifetime claim cannot be independently confirmed against actual performance.
  • Leakage deduction of 0% is justified only as 'deemed negligible' with no quantified analysis, which is thin for a biomass project where displaced fuel or alternative biomass use could generate leakage.
  • Feedstock sustainability, carbon content testing, and usage monitoring method are all absent from the available documents, leaving the biomass supply chain unverified.
  • Three corrective actions (CARs) required the project to establish procedures for emergency preparedness, monitoring, records handling, and corrective actions before operations could proceed, indicating initial operational readiness gaps.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Energy project, no reversal risk

Leakage

0% deduction, thin justification

Baseline

Project-specific, no reassessment data

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents