Hongxingqiao Hydropower Project in Yongsheng County

CDM-7086 ↗

#1121of 1935 in Renewable energy#635of 1084 in China#859of 1459 in CDM (UNFCCC)

5.0/ 10
Integrity
5.0
Transparency
4.5
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A small Chinese hydropower project under CDM with a confirmed investment-test additionality and a reputable VVB, but undermined by a major discrepancy between the PDD's ex-ante estimate (125,419 tCO₂e) and the monitoring report's figure (46,522 tCO₂e), a contradiction in baseline method, eleven material findings at validation, and the absence of a VVB-verified ERR figure. The project is an avoidance-type (grid displacement) with low inherent permanence risk, but safeguards documentation (FPIC, grievance mechanism) is missing from the extracted record.

Red Flags

  • The monitoring report (2022) reports a total ERR of 46,522 tCO₂e for the full 2012–2019 crediting period, while the PDD (2020) states 125,419 tCO₂e for the same period — a 63% shortfall that is never reconciled in the available documents.
  • Eleven material findings were raised at validation (equipment data, IRR spreadsheet errors, missing board-meeting dates, O&M cost inconsistencies, editorial errors), with nine corrective actions required.
  • The VVB-verified ERR figure is not present in the extracted record, leaving the actual credit volume unconfirmed.
  • Baseline method is stated as 'project' in the monitoring report but 'jurisdictional' in the validation report — an unresolved contradiction for a grid-displacement hydro project.

Credit Vintages

IssuedRetiredAvailable
2022
44,637044,637
Total44,637044,637

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversals

Leakage

0% deduction, justification inconsistent across docs

Baseline

Method contradictory; grid EF from 2011

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents