Hongya MSW landfill site biogas power generation project
#48of 268 in Biogas#457of 1084 in China#531of 1339 in Verra (VCS)#11of 34 in AMS-III.G
Audit Analysis
The Hongya MSW landfill biogas project is a registered VCS project with VVB-confirmed additionality and reasonable credit delivery (~84% of pro-rata expectation), but is undermined by four material findings (inconsistent dates and FCH4 values across documents), a 0% leakage deduction with contradictory justifications, and an unresolved contradiction on whether methane capture is legally required. No buffer pool or permanence mechanism is documented, and several monitoring parameters remain unreported.
Red Flags
- Four material findings in the 2026 verification report, including inconsistent FCH4,BL,y values across the monitoring report, verification report, and ER spreadsheet, indicating data quality issues in the credit calculation
- Contradiction on whether methane capture is legally required: the 2026 monitoring report states it is not, while an earlier monitoring report states it is — if legally required, additionality is compromised
- Leakage deduction of 0% with inconsistent justification: the 2022 verification report records it as 'not addressed' while the 2026 monitoring report claims it is 'deemed negligible' without quantification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 27,479 | 0 | 27,479 | |
| 2022 | 23,121 | 0 | 23,121 | |
| Total | 50,600 | 0 | 50,600 |
Risk Indicators
VVB-confirmed but capture-requirement contradiction
mixed evidence / unresolved risk
0% deduction, justification inconsistent across documents
Project-specific modeled baseline, no reassessment date
FPIC and grievance mechanism confirmed in 2026 VR
CORSIA excluded, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →