Hongyan 8 MW Small-scale Hydro Project

CDM-1527 ↗

#1263of 1935 in Renewable energy#759of 1084 in China#996of 1459 in CDM (UNFCCC)#409of 806 in AMS-I.D

4.8/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

The Hongyan 8 MW small-scale hydro project (CDM-1527) uses a standardised methodology (AMS-I.D) with a jurisdictional baseline and an investment additionality test, which are appropriate for the project type. However, the absence of a buffer pool, a leakage justification contradiction between documents, and a low extraction confidence across the record limit confidence in the project's robustness. The identical claimed and verified ERR figures (102,851 tCO₂e) suggest either exact delivery or a lack of independent monitoring verification.

Red Flags

  • No buffer pool or permanence risk mitigation mechanism is documented for the hydro project, leaving reversal risk (e.g., drought, dam failure) unaddressed
  • Contradiction in leakage treatment: the validation report states leakage is 'deemed negligible' while an unidentified document references a 'quantified' approach, creating ambiguity about the actual deduction basis
  • Grid emission factor discrepancy between documents (0.497575 in the validation report vs. 0.8959 in an unidentified source) undermines confidence in the baseline calculation
  • Monitoring period is not stated in any available document, making it impossible to verify whether the 102,851 tCO₂e verified figure reflects actual measured output or a restatement of the ex-ante estimate
  • Low extraction confidence across the document set indicates at least one key document was poorly readable, reducing reliability of the extracted data

Credit Vintages

IssuedRetiredAvailable
2011
32,589032,589
2012
6,49306,493
2013
10,814010,814
Total49,896049,896

Risk Indicators

Additionality

Investment test present but VVB confirmation not explicitly

Permanence

hydro reversal risk (drought, dam

Leakage

0% deduction justified as negligible, but contradicted by an

Baseline

Jurisdictional baseline with 2015 grid EF; reassessed at pro

Safeguards

Safeguards and benefit sharing mentioned, but FPIC and griev

Double-claim

CCP status and CORSIA eligibility not stated in available do

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents