Hongyuan 10 MW Small Hydropower Project
#1122of 1935 in Renewable energy#636of 1084 in China#860of 1459 in CDM (UNFCCC)#363of 806 in AMS-I.D
Audit Analysis
The Hongyuan 10 MW small hydropower project has a VVB-confirmed investment additionality test and a stated grid emission factor, but is undermined by significant contradictions across documents—particularly a seven-fold discrepancy in total emissions reductions (34,202 vs 239,414 tCO₂), a conflicting baseline method description, and unresolved material findings including pending IRR worksheets and bilateral approvals. The absence of a buffer pool, a 0% leakage deduction with inconsistent justification, and the lack of any verified ERR figure for the monitoring period limit confidence in the project's integrity and claim safety.
Red Flags
- Total ERR figures differ by a factor of seven between the PDD (239,414 tCO₂) and the validation report (34,202 tCO₂), with no reconciliation found in the monitoring report
- Material finding CAR 1: written approvals from the Netherlands and China were still pending at the time of the monitoring report (July 2012), raising questions about the validity of the additionality claim
- Corrective action requiring detailed IRR worksheets with and without CDM revenues was never confirmed as resolved in the available documents
- Baseline method is described as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report, creating ambiguity about the baseline construction
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but IRR worksheets unresolved
no reversal data
0% deduction with contradictory justification
Method contradicts between documents
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →