*Honiton Energy Bailingmiao Phase One Windfarm Project
GS-794 ↗ · current registry ID: GS449
#189of 1084 in China#213of 1801 in Gold Standard (GS)#350of 1287 in ACM0002
Audit Analysis
A Gold Standard wind project in China with a reputable VVB (TÜV NORD CERT) and a jurisdictional baseline, but the record is marred by three material findings (a one-year shutdown, delayed meter calibrations, and spreadsheet data inconsistencies) that required corrective actions. Four cross-document contradictions—particularly the baseline method and grid emission factor—introduce uncertainty into the credit calculation. The project is CCP-approved, and the verified-to-claimed ERR ratio suggests the project is over-delivering relative to its ex-ante estimate, which is a positive signal for claim safety.
Red Flags
- Three material findings in the 2012 verification report: a full-year shutdown (Apr 2010–Mar 2011), delayed calibration of three meters requiring conservative adjustment, and inconsistencies in emission-reduction spreadsheet traceability
- Baseline method contradiction: the 2009 verification report describes a project-specific baseline while the 2012 report describes a jurisdictional baseline, creating ambiguity about which method underpins the credits
- Grid emission factor discrepancy: 1.0548 in the 2012 verification report versus 0.92875 (2014 data) in the 2015 PDD, a ~12% difference that directly affects credit volume
- Additionality VVB confirmation is not explicitly stated in the extracted record, leaving the investment test's independent verification unconfirmed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 99,196 | 99,196 | 0 | |
| 2009 | 140,166 | 105,319 | 34,847 | |
| 2010 | 19,841 | 0 | 19,841 | |
| 2011 | 54,296 | 0 | 54,296 | |
| Total | 313,499 | 204,515 | 108,984 |
Risk Indicators
Investment test present; VVB confirmation not explicitly stated in record
Avoidance project; no inherent reversal risk
0% deduction; deemed negligible, reasonable for wind
Jurisdictional baseline; contradiction with earlier project-specific description
Grievance mechanism and benefit sharing documented; FPIC not stated
CCP approved; CORSIA eligibility not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →