Hot air generation using renewable biomass fuel for spray drying and vertical drying application at H.&R. Johnson (India) Limited, Dewas, Madhya Pradesh.
#64of 352 in Biomass#431of 975 in India#621of 1459 in CDM (UNFCCC)#20of 115 in AMS-I.C
Audit Analysis
A CDM-era biomass energy substitution project at an Indian food-processing plant, verified by TÜV SÜD with a confirmed barrier additionality test and no reversal events. The project is structurally sound as an avoidance-type credit, but suffers from a project-specific baseline, sparse safeguards documentation (no FPIC or grievance mechanism on record), and a notable 30% discrepancy in reported ERR between two monitoring periods. Overall a moderate-quality credit with meaningful evidence gaps typical of early CDM vintages.
Red Flags
- ERR figures differ by ~30% between two monitoring reports (7,800 tCO₂e in the 2011 report vs 11,079 tCO₂e in the 2009 report), suggesting operational variability or inconsistent baseline application across periods
- Validation report (2008) did not address leakage at all, while the later monitoring report (2012) simply deems it negligible without quantification — a gap in the leakage analysis chain
- No FPIC, grievance mechanism, or detailed safeguards documentation found in any of the 15 extracted documents, despite the project operating in a community setting in Madhya Pradesh
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 4,761 | 0 | 4,761 | |
| 2011 | 18,879 | 0 | 18,879 | |
| Total | 23,640 | 0 | 23,640 |
Risk Indicators
VVB-confirmed barrier test
Avoidance project, no reversal risk
Deemed negligible, not quantified
Project-specific, no reassessment on record
Mentioned but FPIC and grievance mechanism absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →