Household biogas plants in rural parts of North East India
GS-2170 ↗ · current registry ID: GS7576
#6of 268 in Biogas#131of 975 in India#104of 1801 in Gold Standard (GS)#2of 60 in AMS-I.E
Audit Analysis
A household biogas project in rural North-East India with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by 16 corrective actions, multiple contradictions in ERR figures and crediting period dates, and a project-specific baseline. The project over-delivers relative to its pro-rata expectation, suggesting a conservative baseline, yet the volume of documentation errors and unresolved data inconsistencies limit confidence in the reported figures.
Red Flags
- 16 corrective actions required across the verification report, including errors in emission reduction calculations, missing precision values, and inconsistent monitoring data between the MR and ER worksheet
- Crediting period end date is missing (null) in the 2024 verification report, while the 2025 monitoring report states 2028-11-19 — the applicable period is ambiguous
- FNRB method contradicts between documents: local field measurement (verification report, 2023) vs national default (PDD, 2024), with no clear resolution
- FPIC was not conducted despite the project serving rural indigenous communities in North-East India
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 3,571 | 3,571 | 0 | |
| 2019 | 31,027 | 31,027 | 0 | |
| 2020 | 34,777 | 34,777 | 0 | |
| 2021 | 41,351 | 40,525 | 826 | |
| 2022 | 43,427 | 22,348 | 21,079 | |
| 2023 | 38,446 | 0 | 38,446 | |
| Total | 192,599 | 132,248 | 60,351 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, reassessed 2023
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →