HPP José Luiz Müller de Godoy Pereira (JUN1173), Brazil
#1028of 1935 in Renewable energy#80of 211 in Brazil#764of 1459 in CDM (UNFCCC)#810of 1287 in ACM0002
Audit Analysis
A CDM small-hydro project in Brazil with a sound jurisdictional baseline and VVB-confirmed additionality, but undermined by three corrective action requests flagging calculation errors in the validation report, a complete absence of monitoring data, and a notable safeguards gap (no FPIC, no grievance mechanism). The fundamental hydro-displacement claim is credible, yet the documentation record is thin and the safeguards picture is weak.
Red Flags
- Three corrective action requests (CARs) in the validation report indicate the emission factor calculation was performed for the wrong crediting period, the crediting-period start date was mis-set, and a required parameter (EFRes) was omitted from the PDD
- No Free, Prior and Informed Consent (FPIC) was conducted and no grievance mechanism is in place, despite the project operating in a Brazilian community context
- No monitoring report or verified ERR figure is present in the extracted record; the project has been in its first crediting period since October 2021 with no public verification data
- The PDD and validation report (both dated 27 July 2022) disagree on whether safeguards and benefit-sharing are described, creating ambiguity about the project's social compliance
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Hydro asset – no reversal risk
0% – negligible for grid displacement
Jurisdictional, reassessed 2022
No FPIC, no grievance mechanism
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →