Skip to main content
CDMHydroBrazilACM0002

HPP José Luiz Müller de Godoy Pereira (JUN1173), Brazil

CDM-10028 ↗

#1028of 1935 in Renewable energy#80of 211 in Brazil#764of 1459 in CDM (UNFCCC)#810of 1287 in ACM0002

5.1/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
6.0
Documentation
4.5

Audit Analysis

A CDM small-hydro project in Brazil with a sound jurisdictional baseline and VVB-confirmed additionality, but undermined by three corrective action requests flagging calculation errors in the validation report, a complete absence of monitoring data, and a notable safeguards gap (no FPIC, no grievance mechanism). The fundamental hydro-displacement claim is credible, yet the documentation record is thin and the safeguards picture is weak.

Red Flags

  • Three corrective action requests (CARs) in the validation report indicate the emission factor calculation was performed for the wrong crediting period, the crediting-period start date was mis-set, and a required parameter (EFRes) was omitted from the PDD
  • No Free, Prior and Informed Consent (FPIC) was conducted and no grievance mechanism is in place, despite the project operating in a Brazilian community context
  • No monitoring report or verified ERR figure is present in the extracted record; the project has been in its first crediting period since October 2021 with no public verification data
  • The PDD and validation report (both dated 27 July 2022) disagree on whether safeguards and benefit-sharing are described, creating ambiguity about the project's social compliance

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Hydro asset – no reversal risk

Leakage

0% – negligible for grid displacement

Baseline

Jurisdictional, reassessed 2022

Safeguards

No FPIC, no grievance mechanism

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents