HPPCL Integrated Kashang Hydro Electric Project

CDM-7689 ↗

#1114of 1935 in Renewable energy#573of 975 in India#847of 1459 in CDM (UNFCCC)#869of 1287 in ACM0002

5.0/ 10
Integrity
6.5
Transparency
3.5
Claim Safety
5.5
Documentation
3.5

Audit Analysis

The Kashang Hydro project is a large-scale CDM hydroelectric project in India with a confirmed investment additionality test and a standard jurisdictional grid baseline. However, the available record is heavily weighted toward the 2012 validation phase, with no verified monitoring data, no buffer pool, and low extraction confidence, making it difficult to assess actual delivery and long-term integrity. Seven corrective action requests during validation (all resolved) and a minor contradiction on the additionality test type introduce modest reliability concerns.

Red Flags

  • Seven Corrective Action Requests (CARs) were raised during validation, indicating material issues that had to be resolved before approval
  • No verified ERR or monitoring period data is available in the extracted record, preventing any assessment of actual credit delivery
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and data completeness is uncertain
  • One of the six source documents is classified as 'unknown' type, reducing confidence in the evidentiary base

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible, reasonable for grid hydro

Baseline

Jurisdictional grid EF, standard for hydro

Safeguards

FPIC conducted, safeguards and benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM 0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents