HTW 20MW PV Power Generation Project
#689of 1935 in Renewable energy#336of 1084 in China#477of 1459 in CDM (UNFCCC)#532of 1287 in ACM0002
Audit Analysis
A 20 MW solar PV project in China under CDM (ACM0002) with a jurisdictional grid-emission-factor baseline and VVB-confirmed investment additionality. The project is methodologically sound for its type, but the available record is limited to validation-stage documents with no monitoring or verification data, and two minor contradictions between the PDD and validation report reduce confidence in the completeness of the evidence base.
Red Flags
- No monitoring or verification reports are present in the extracted record; the only ERR figure available is the ex-ante lifetime claim of 207,319 tCO2e with no verified counterpart.
- Nine material findings were raised during validation (including inconsistent solar-cell and inverter data, missing monitoring variables, and an undefined plant load factor), all resolved but indicating initial documentation gaps.
- Leakage justification is contradictory: the validation report states 'deemed negligible' while an appendix references a 'quantified' treatment, leaving the actual basis ambiguous.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
PV generation – no reversal risk
0% deduction, justification contradicted in appendix
Jurisdictional grid EF, standard CDM approach
Safeguards mentioned, benefit-sharing described; FPIC and gr
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →