Huachuan (Baoshan) Wind Power Project
#1264of 1935 in Renewable energy#761of 1084 in China#998of 1459 in CDM (UNFCCC)#982of 1287 in ACM0002
Audit Analysis
A CDM wind project validated in 2012 with a jurisdictional baseline and VVB-confirmed additionality, but the available record contains only the validation-stage documentation with no monitoring reports or verified emissions reductions. Three material findings required corrective action, and the absence of post-validation data limits confidence in actual delivery.
Red Flags
- Three material findings (missing LoAs, incomplete IRR calculation, absent monitoring system description) required corrective action at validation, indicating process gaps in the PDD
- No monitoring reports or verified ERR figures are present in the extracted record, so actual credit delivery cannot be confirmed
- The PDD states a total of 718,844 tCO2e while the validation report states 102,692 tCO2e — a 7× difference that, while likely reflecting annual vs. full-crediting-period bases, creates ambiguity in the public record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Negligible, justified for wind
Jurisdictional grid EF, standardised
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →