Huachuan (daqingbeishan) Wind Power Project
#697of 1935 in Renewable energy#345of 1084 in China#485of 1459 in CDM (UNFCCC)#538of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a verified combined additionality test and jurisdictional baseline, but significant documentation gaps including no monitoring data, low extraction confidence, and multiple corrective actions required during validation. The project type (wind) inherently carries low permanence and leakage risk, but the absence of verified delivery data and initial PDD weaknesses (missed similar projects, incomplete IRR) temper confidence in the credit claims.
Red Flags
- Two similar non-CDM wind projects in Heilongjiang were not identified in the initial PDD (CAR 04), raising questions about the common-practice component of additionality
- VAT policy on equipment purchase was omitted from the initial IRR calculation (CAR 03), potentially overstating the financial additionality case
- No monitoring reports or verified ERR figures found in the extracted record — delivery performance cannot be confirmed
- Low extraction confidence across the document set, with one document of unknown type, limiting assurance of data completeness
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Negligible, appropriate for grid wind
Jurisdictional grid EF (2010)
Mentioned but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →