5.5/ 10
Integrity
6.5
Transparency
4.5
Claim Safety
6.0
Documentation
4.0

Audit Analysis

A CDM wind power project in China with a verified combined additionality test and jurisdictional baseline, but significant documentation gaps including no monitoring data, low extraction confidence, and multiple corrective actions required during validation. The project type (wind) inherently carries low permanence and leakage risk, but the absence of verified delivery data and initial PDD weaknesses (missed similar projects, incomplete IRR) temper confidence in the credit claims.

Red Flags

  • Two similar non-CDM wind projects in Heilongjiang were not identified in the initial PDD (CAR 04), raising questions about the common-practice component of additionality
  • VAT policy on equipment purchase was omitted from the initial IRR calculation (CAR 03), potentially overstating the financial additionality case
  • No monitoring reports or verified ERR figures found in the extracted record — delivery performance cannot be confirmed
  • Low extraction confidence across the document set, with one document of unknown type, limiting assurance of data completeness

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, appropriate for grid wind

Baseline

Jurisdictional grid EF (2010)

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents