Huadian Daan Fengshuishan Phase III Wind Farm Project
#1434of 1935 in Renewable energy#889of 1084 in China#1180of 1459 in CDM (UNFCCC)#1101of 1287 in ACM0002
Audit Analysis
A CDM wind project in China with a VVB-confirmed combined additionality test and a jurisdictional baseline, but severely limited by the absence of any monitoring data, a low extraction confidence rating, and six material documentation findings at validation. The ERR figures in the PDD and validation report differ by a factor of seven, which is consistent with an annual-versus-lifetime presentation difference rather than a true discrepancy, but the overall evidentiary record is thin.
Red Flags
- Total ERR claimed differs by a factor of 7 between the PDD (652,260 tCO₂e) and the validation report (93,180 tCO₂e); while arithmetically consistent with a 7-year crediting period, the lack of a monitoring report to confirm actual delivery leaves the claim unverified.
- Six material findings (two CARs, four CLs) at validation, including missing DNA Letters of Approval and incomplete PDD descriptions of O&M costs and grid-connection details.
- No monitoring report, verified ERR, or monitoring period is present in the extracted record, so actual credit delivery cannot be assessed.
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the extracted data.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
wind turbine life unverifie
Deemed negligible, appropriate for wind
Jurisdictional per VVB but contradicted in appendix; no reas
Safeguards and benefit-sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →