Skip to main content
CDMWindChinaACM0002

Huadian Guyuan Phase III 49.5MW Wind Farm Project

CDM-7239 ↗

#699of 1935 in Renewable energy#347of 1084 in China#487of 1459 in CDM (UNFCCC)#540of 1287 in ACM0002

5.5/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
6.0
Documentation
5.0

Audit Analysis

A 49.5 MW onshore wind project in China registered under CDM with a jurisdictional grid-emission-factor baseline and VVB-confirmed combined additionality test. The credit type carries inherently low permanence and leakage risk, but the validation report flagged eight material PDD deficiencies requiring corrective action, and no monitoring-period data is available to confirm actual delivery. The project's crediting period expired in October 2019 with no post-project verification on record.

Red Flags

  • Eight material findings in the validation report (2012) covering PDD boundary, technical specifications, metering accuracy, and EG calculation methodology, each requiring corrective action before registration
  • No monitoring-period data or verified ERR figures are available in the extracted record, so actual credit delivery cannot be confirmed
  • Total ERR is reported as 104,898 tCO₂e in the validation report but 734,286 tCO₂e in the PDD — the 7× ratio matches the 7-year crediting period, indicating an annual-vs-lifetime reporting-basis mismatch rather than a true discrepancy, but the inconsistency across documents is a documentation weakness
  • Crediting period ended 2019-10-01 with no evidence of post-project monitoring or closure reporting in the available documents

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, consistent with wind

Baseline

Jurisdictional grid EF (0.8958, 2009)

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents