Huadian Guyuan Yueliangshan 49.5MW Wind Power Project Phase I
#268of 1935 in Renewable energy#102of 1084 in China#169of 1459 in CDM (UNFCCC)#198of 1287 in ACM0002
Audit Analysis
A standard CDM wind power project (49.5 MW) in China validated by TÜV NORD using the well-established ACM0002 methodology. Additionality is confirmed via a combined test and the baseline relies on the 2010 grid emission factor, both appropriate for the sector. Nine material findings were raised at validation (all subsequently resolved), and several data fields remain unreported, limiting full confidence in the MRV chain.
Red Flags
- Nine material findings at validation (LOAs unavailable, IRR spreadsheet errors, incorrect monitoring cross-checks, stakeholder comments not clearly described) — all resolved but indicating initial documentation quality gaps
- Baseline method described as 'project' in the monitoring report but 'jurisdictional' in the validation report, creating ambiguity about the exact baseline construction
- Verified ERR figure is not stated in the extracted record; only the claimed 98,693 tCO₂e for the 14-month monitoring period is available
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 98,419 | 0 | 98,419 | |
| Total | 98,419 | 0 | 98,419 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% with negligible justification, appropriate for wind
Grid EF 2010, method contradiction across docs
Safeguards mentioned, benefit sharing described, FPIC/grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →