Skip to main content
CDMSolarChinaACM0002

Huadian Hami 40 MWp Grid-connected Photovoltaic Power Project

CDM-8199 ↗

#513of 1935 in Renewable energy#224of 1084 in China#342of 1459 in CDM (UNFCCC)#387of 1287 in ACM0002

5.8/ 10
Integrity
6.5
Transparency
5.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

A 40 MWp grid-connected solar PV project in China validated under CDM methodology ACM0002, with a jurisdictional (grid-emission-factor) baseline and VVB-confirmed combined additionality test. The core claim is methodologically sound, but the validation report carries one corrective action and five comments, and the available record lacks monitoring reports, FNRB details, and usage-rate data, limiting confidence in the full MRV chain.

Red Flags

  • One corrective action (CAR) and five comments (CLs) were raised in the validation report, including insufficient evidence for DNA approval letters, technical parameters, and local-resident comments
  • No monitoring or verification reports are present in the extracted record; the monitoring period is not stated, leaving the MRV chain incomplete
  • FNRB method and value are not stated in any available document, creating uncertainty about the functional need and replacement baseline assumptions
  • Leakage justification is inconsistent between the validation report ('deemed negligible') and an appendix ('quantified'), though the validation report is privileged as the authoritative document

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justified as negligible for grid-connected solar

Baseline

Jurisdictional grid-EF baseline (2011)

Safeguards

Safeguards mentioned, benefit sharing described; FPIC and grievance mechanism not stated

Double-claim

CCP and CORSIA status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents