Huadian Hami Shisanjianfang Phase II 49.5MW Wind Farm Project
#1384of 1935 in Renewable energy#845of 1084 in China#1119of 1459 in CDM (UNFCCC)#1066of 1287 in ACM0002
Audit Analysis
A 49.5 MW wind farm in China's Hami region validated under CDM methodology ACM0002 with a jurisdictional grid baseline and VVB-confirmed combined additionality test. However, the validation report carries three corrective action requests and eight clarifications, the ERR figures in the PDD and validation report differ by a factor of seven (likely annual vs. total), and no monitoring or verification data is available in the extracted record. The project is a standard avoidance-type wind credit with low inherent reversal risk, but documentation gaps and unresolved compliance items limit confidence.
Red Flags
- Three corrective action requests (CARs) in the validation report, including missing Letters of Approval from the host country and UK DNA, a missing MoC statement, and a non-conservative calculation method for net electricity supplied when capacity shares a transformer
- ERR figures differ by a factor of seven between the PDD (698,236 tCO2) and the validation report (99,748 tCO2); while likely an annual-vs-total discrepancy, the inconsistency was not explicitly reconciled in the documents
- No monitoring report, verified ERR, or post-validation data is present in the extracted record, making it impossible to confirm actual delivery against the ex-ante estimate
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but with CARs on calculation conservatism and benchmark justification
Wind avoidance project; no reversal risk identified
0% deduction, deemed negligible—appropriate for wind
Jurisdictional grid EF (2012); reassessment date not stated
Safeguards and benefit-sharing mentioned; no FPIC or grievance mechanism documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →