Huadian Hebei Kangbao Chuzhangdi First Phase 49.5MW Wind Power Project
#1269of 1935 in Renewable energy#766of 1084 in China#1003of 1459 in CDM (UNFCCC)#987of 1287 in ACM0002
Audit Analysis
A 49.5 MW CDM wind project validated in 2012 under ACM0002 with a jurisdictional grid baseline and VVB-confirmed additionality, but the validation report identified five material findings including missing DNA approvals and a non-conforming emission calculation equation. No monitoring or verification data is available in the extracted record, and several key parameters (buffer pool, FNRB, usage rates) are not stated, limiting the ability to confirm claim safety.
Red Flags
- Five material findings at validation, including missing Letters of Approval from both China's and the UK's Designated National Authorities, and an emission calculation equation that did not follow ACM0002
- No buffer pool percentage or reversal-event data found in any available document, leaving permanence risk for the 7-year crediting period unquantified
- No verified ERR figure or monitoring-period data available to cross-check the 781,956 tCO₂e lifetime claim
- Contradiction between the validation report (leakage 'deemed negligible') and an appendix (leakage 'quantified') creates ambiguity in the leakage treatment
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction; minor doc contradiction
Jurisdictional grid; PDD contradiction
Mentioned; FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →