Skip to main content
CDMWindChinaACM0002

Huadian Hebei Kangbao Chuzhangdi First Phase 49.5MW Wind Power Project

CDM-6856 ↗

#1269of 1935 in Renewable energy#766of 1084 in China#1003of 1459 in CDM (UNFCCC)#987of 1287 in ACM0002

4.8/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A 49.5 MW CDM wind project validated in 2012 under ACM0002 with a jurisdictional grid baseline and VVB-confirmed additionality, but the validation report identified five material findings including missing DNA approvals and a non-conforming emission calculation equation. No monitoring or verification data is available in the extracted record, and several key parameters (buffer pool, FNRB, usage rates) are not stated, limiting the ability to confirm claim safety.

Red Flags

  • Five material findings at validation, including missing Letters of Approval from both China's and the UK's Designated National Authorities, and an emission calculation equation that did not follow ACM0002
  • No buffer pool percentage or reversal-event data found in any available document, leaving permanence risk for the 7-year crediting period unquantified
  • No verified ERR figure or monitoring-period data available to cross-check the 781,956 tCO₂e lifetime claim
  • Contradiction between the validation report (leakage 'deemed negligible') and an appendix (leakage 'quantified') creates ambiguity in the leakage treatment

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction; minor doc contradiction

Baseline

Jurisdictional grid; PDD contradiction

Safeguards

Mentioned; FPIC and grievance not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents