Skip to main content
CDMWindChinaACM0002

Huadian Hebei Yuzhou Zhenjiawan 49.5MW Wind Power Project

CDM-7464 ↗

#226of 1935 in Renewable energy#81of 1084 in China#141of 1459 in CDM (UNFCCC)#163of 1287 in ACM0002

6.3/ 10
Integrity
7.0
Transparency
5.0
Claim Safety
7.0
Documentation
5.5

Audit Analysis

A standard CDM wind power project (49.5 MW, Hebei, China) using the well-established ACM0002 methodology with a jurisdictional grid baseline and VVB-confirmed combined additionality test. The project is methodologically sound with appropriate leakage treatment for a grid-displacement wind project, but the available record lacks monitoring reports and verified emission reduction figures, limiting the ability to confirm actual delivery against the ex-ante estimate.

Red Flags

  • No monitoring reports or verified emission reduction figures are present in the extracted record, so actual delivery against the ex-ante estimate cannot be confirmed.
  • Four corrective action requests (CARs) were raised during validation relating to the financial analysis underpinning the additionality test (tax rate inconsistency, loss carry-forward, sensitivity analysis traceability), all of which were subsequently corrected.
  • The grid emission factor is from 2011, one year before the crediting period start; no evidence of periodic EF updates during the 2013–2019 crediting period is available in the extracted documents.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversals

Leakage

0% with valid justification

Baseline

Jurisdictional, EF from 2011, no update evidence

Safeguards

Mentioned, benefit sharing described, FPIC/grievance not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents