Skip to main content
CDMWindChinaACM0002

Huadian Heilongjiang Tangyuan Qushou Wind Farm Project

CDM-6792 ↗

#1038of 1935 in Renewable energy#577of 1084 in China#775of 1459 in CDM (UNFCCC)#818of 1287 in ACM0002

5.1/ 10
Integrity
6.0
Transparency
4.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A CDM wind farm project validated by Bureau Veritas with a jurisdictional grid-emission-factor baseline and a VVB-confirmed combined additionality test. The core design is sound for a wind project, but the absence of any monitoring data, four outstanding corrective actions (including missing Letters of Agreement from both DNAs), and a contradiction in the leakage treatment limit confidence in the claimed 735,070 tCO₂e.

Red Flags

  • Four corrective actions remain outstanding, including missing Letters of Agreement from both China's and the UK's Designated National Authorities and an incomplete IRR calculation in the additionality analysis.
  • No monitoring report or verified ERR figure is present in the extracted record, so the claimed 735,070 tCO₂e cannot be cross-checked against actual performance.
  • A contradiction exists between the validation report (leakage 'deemed negligible') and an appendix (leakage 'quantified'), creating ambiguity about whether any leakage was actually calculated.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance-type wind, no reversal risk

Leakage

0% deduction, justified for wind

Baseline

Jurisdictional grid-EF baseline

Safeguards

Mentioned but FPIC and grievance mechanism not detailed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents