Huadian Inner Mongolia Huitengxile 100.25MW Wind Farm Project
#968of 1935 in Renewable energy#524of 1084 in China#712of 1459 in CDM (UNFCCC)#761of 1287 in ACM0002
Audit Analysis
A 100.25 MW onshore wind project in Inner Mongolia validated under CDM methodology ACM0002 with a jurisdictional grid-emission-factor baseline and a combined additionality test. The project design is sound for its type, but the available record is limited to validation-stage documents with no monitoring or verification reports, leaving the actual delivery of emissions reductions unconfirmed. Two apparent contradictions in the extracted data (ERR figures and leakage treatment) are largely resolvable as differences in reporting period and document hierarchy.
Red Flags
- No monitoring or verification reports are present in the extracted record; actual emissions reductions over the 2014–2021 crediting period are unconfirmed.
- The PDD (Oct 2013) states a lifetime ERR of 1,676,570 tCO₂ while the validation report (Nov 2013) states 239,510 tCO₂; although the ratio is consistent with an annual-vs-lifetime interpretation, the documents do not explicitly label the basis, creating ambiguity.
- Grid emission factor is drawn from 2012 data; no evidence of periodic grid-EF updates during the 7-year crediting period is available.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 75,803 | 0 | 75,803 | |
| 2009 | 334,132 | 0 | 334,132 | |
| 2010 | 107,959 | 0 | 107,959 | |
| 2011 | 416,935 | 0 | 416,935 | |
| 2012 | 197,424 | 0 | 197,424 | |
| 2013 | 103,701 | 0 | 103,701 | |
| Total | 1,235,954 | 0 | 1,235,954 |
Risk Indicators
Combined test present but VVB confirmation not explicitly stated
Avoidance project – no reversal risk
0 % deduction, negligible for grid-displacement wind
Jurisdictional grid-EF baseline; 2012 EF, no update evidence
Safeguards mentioned; FPIC and grievance mechanism not documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →