Huadian Inner Mongolia Keqi Wutaohai Phase I Wind farm Project

CDM-6816 ↗

#445of 1935 in Renewable energy#180of 1084 in China#292of 1459 in CDM (UNFCCC)#334of 1287 in ACM0002

5.9/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

A CDM wind farm project with a solid additionality assessment (combined test verified by TÜV SÜD) and a jurisdictional baseline, but the available record lacks any monitoring or verification reports, leaving the actual emissions reductions unverified. The ERR figures in the validation report and PDD differ by a factor of roughly seven, which is consistent with an annual-versus-lifetime basis but was not explicitly reconciled in the documents. Overall a low-risk technology with moderate documentation gaps.

Red Flags

  • No monitoring or verification reports found in the extracted record; actual emissions reductions for the 2013–2019 crediting period are unconfirmed
  • ERR discrepancy: the validation report states 113,097 tCO₂e while the PDD states 791,679 tCO₂e — likely an annual vs. lifetime basis, but not explicitly reconciled in the documents
  • FNRB method and value are not stated in any available document, leaving the net benefit calculation unverifiable

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

Wind avoidance, no reversal risk

Leakage

Deemed negligible, appropriate for wind

Baseline

Jurisdictional grid EF (1.0103, 2010)

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents