Skip to main content
CDMWindChinaACM0002

Huadian Jilin Shuangliao Namusi 49.5MW Wind Power Project

CDM-7524 ↗

#514of 1935 in Renewable energy#225of 1084 in China#343of 1459 in CDM (UNFCCC)#388of 1287 in ACM0002

5.8/ 10
Integrity
7.5
Transparency
4.0
Claim Safety
6.5
Documentation
3.5

Audit Analysis

A 49.5 MW onshore wind project in China validated under CDM methodology ACM0002 v13.0.0 with a solid combined additionality test confirmed by TÜV SÜD and a jurisdictional baseline. The project is inherently low-risk (avoidance-type, no reversal or leakage concerns), but the available documentation is limited to the PDD and validation report, with no verification or monitoring reports extracted and low extraction confidence, leaving significant transparency gaps.

Red Flags

  • No verification or monitoring reports found in the extracted record; total verified ERR is not stated, making it impossible to confirm actual delivery against the ex-ante estimate
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the extracted data
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel or double-claiming risk unassessed

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, negligible for wind

Baseline

Jurisdictional, no reassessment data

Safeguards

Mentioned, benefit sharing noted, FPIC/grievance unstated

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents