Huadian Kezuozhongqi Wind Power Phase I Project
#703of 1935 in Renewable energy#351of 1084 in China#491of 1459 in CDM (UNFCCC)#544of 1287 in ACM0002
Audit Analysis
A CDM wind power project with solid additionality (combined test confirmed by BVQI) and a jurisdictional grid baseline, benefiting from the inherent permanence of an avoidance-type project. However, the available record is limited to validation-stage documents with no monitoring or verification reports, and a notable discrepancy exists between the PDD and validation report on the ex-ante emission reduction estimate. The thin leakage justification and absence of safeguards detail temper an otherwise low-risk project design.
Red Flags
- ERR contradiction: the PDD (April 2011) states 930,293 tCO2e while the validation report (January 2011) states 132,899 tCO2e — a 7× difference that, while likely reflecting a revision between drafts, undermines confidence in the final figure without a verification report to confirm
- No monitoring reports or verification reports are present in the extracted record, so no verified emission reductions can be confirmed against the ex-ante estimate
- Leakage is set at 0% with only a 'deemed negligible' label and no supporting quantitative analysis in the available documents
- Safeguards are mentioned in the validation report but no FPIC process, grievance mechanism, or benefit-sharing detail is documented
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, justification minimal
Jurisdictional grid EF, standard method
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →