6.2/ 10
Integrity
6.5
Transparency
5.0
Claim Safety
7.0
Documentation
6.0

Audit Analysis

A 201 MW onshore wind project under CDM with a VVB-confirmed investment additionality test and a conservative ex-ante emission estimate that the first monitoring period substantially exceeded. The project is free of inherent reversal risk (avoidance-type), but documentation gaps (no verified ERR figure, no fnrb data, CDM-era reporting) and a baseline-method contradiction between the validation and monitoring reports limit confidence. Overall a solid but mid-tier credit with no critical red flags.

Red Flags

  • Baseline method is stated as 'project-specific' in the monitoring report but 'jurisdictional' in the validation report — an unresolved contradiction that affects baseline credibility
  • No verified ERR figure is available in the extracted record; only the claimed figure (245,259 tCO₂) from the monitoring report is present
  • Leakage justification is inconsistent: the monitoring report says 'quantified' while the validation report says 'deemed negligible', both yielding a 0% deduction
  • No verification report appears in the evidence document list; only a validation report and a single monitoring report are available
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2011
246,0530246,053
Total246,0530246,053

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance-type, no reversal risk

Leakage

0% deduction, inconsistent justification

Baseline

Project-specific, method contradicts across docs

Safeguards

Mentioned but FPIC and grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents