Huadian Laizhou Jincheng First Phase 48 MW Wind Power Project
#704of 1935 in Renewable energy#352of 1084 in China#492of 1459 in CDM (UNFCCC)#545of 1287 in ACM0002
Audit Analysis
A 48 MW onshore wind project under CDM with a jurisdictional baseline and VVB-confirmed additionality, but significant data gaps in verified emissions, monitoring details, and a major discrepancy between the PDD and validation report on total emission reductions. The project type (wind avoidance) carries inherently low permanence and leakage risk, but the absence of a monitoring report and the ERR contradiction limit confidence in the claimed figures.
Red Flags
- Major discrepancy in total emission reductions: the PDD (2012-07-05) states 576,870 tCO2e while the validation report (2012-07-06) states 82,410 tCO2e — a roughly 7-fold difference that is unexplained in the available documents
- No verified emissions figure is available; the monitoring report data is absent from the extracted record, making it impossible to confirm actual delivery against the ex-ante estimate
- No buffer pool or permanence mechanism is documented, and no reversal events data is available (though wind is an avoidance project with minimal reversal risk)
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, minimal reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional but no reassessment data
Mentioned but FPIC and grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →