Huadian Laizhou Wind Farm Project
#150of 1935 in Renewable energy#49of 1084 in China#95of 1459 in CDM (UNFCCC)#109of 1287 in ACM0002
Audit Analysis
The Huadian Laizhou Wind Farm is a straightforward CDM wind project with a solid additionality case (combined test, IRR below benchmark, VVB-confirmed) and standard zero-leakage treatment under ACM0002. However, documentation gaps around verified ERR figures, safeguards detail, and a contradiction in baseline classification between the PDD and monitoring report moderate confidence. The project is low-risk on permanence (avoidance-type) but lacks transparency on CORSIA/CCP status.
Red Flags
- Baseline method is labelled 'project' in the 2012 monitoring report but 'jurisdictional' in the PDD — the grid emission factor (1.0755 tCO2e/MWh, combined margin, 2007) is jurisdictional in nature, suggesting a mischaracterisation in the later document
- Crediting period differs between the validation report (2009-10-01 to 2016-09-30) and the 2012 monitoring report (2010-08-30 to 2017-08-29), creating ambiguity about the actual project lifetime
- Total ERR verified figure is not stated in any available document; only claimed figures (73,569 and 64,512 for different periods) are available
- CORSIA eligibility and CCP status are not stated in any document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 64,512 | 0 | 64,512 | |
| 2012 | 73,569 | 0 | 73,569 | |
| Total | 138,081 | 0 | 138,081 |
Risk Indicators
VVB-confirmed combined test, IRR below benchmark
Avoidance-type wind, no reversal risk
Zero per ACM0002, standard for wind
Grid EF 2007, method label inconsistent across docs
Mentioned and benefit sharing described, but FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →