Huadian Ningxia Haiyuan Xiajiayao 49.5MW Wind Power Project
#783of 1935 in Renewable energy#398of 1084 in China#563of 1459 in CDM (UNFCCC)#613of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China registered under CDM with a jurisdictional grid-emission-factor baseline and a VVB-confirmed combined additionality test. The project is structurally sound for its type, but the available record lacks a verified ERR figure, a monitoring report, and several MRV details, and the extraction confidence from source documents is low. The 11 clarification requests raised by DNV during validation were all resolved without corrective actions, and the 0% leakage deduction is reasonable for a grid-displacement wind project.
Red Flags
- No verified ERR figure is available in the extracted record, making it impossible to confirm whether the 569,303 tCO₂e claimed over the 7-year crediting period was actually delivered.
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and some facts may be incomplete or misread.
- Eleven clarification requests (CL 1–CL 11) were raised by the VVB during validation, covering technical parameters, ODA funding, common-practice analysis, grid-EF calculation, meter accuracy, and stakeholder consultation — all resolved, but the volume suggests the initial PDD had notable gaps.
- No monitoring report appears in the evidence document list, so period-by-period performance data is absent from the record.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project
0% deemed negligible; reasonable for wind
Jurisdictional grid EF (0.89635, 2012)
Safeguards and benefit-sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →