Huadian Ningxia Ningdong Phase V Wind Farm Project

CDM-7264 ↗

#515of 1935 in Renewable energy#226of 1084 in China#344of 1459 in CDM (UNFCCC)#389of 1287 in ACM0002

5.8/ 10
Integrity
6.8
Transparency
4.8
Claim Safety
6.5
Documentation
4.2

Audit Analysis

A standard CDM wind farm project in China with a well-verified combined additionality test and a jurisdictional grid-emission-factor baseline, but significant transparency gaps due to the absence of any monitoring-period data or verified emission reductions. The project is an avoidance-type credit with inherently low permanence risk, and the numerous (but purely administrative) material findings in the validation report do not undermine the core methodology.

Red Flags

  • No monitoring-period data or verified emission reductions found in any available document, making it impossible to confirm actual delivery against the 589,176 tCO₂e claim
  • Minimum extraction confidence is low, indicating at least one key document was poorly readable and the extracted record may be incomplete
  • Contradiction between the validation report (leakage 'deemed negligible') and an appendix (leakage 'quantified') creates ambiguity about whether leakage was actually calculated

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justified for wind

Baseline

Jurisdictional grid EF, standard

Safeguards

Mentioned but details sparse

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents