Huadian Ningxia Ningdong Yangjiayao 45MW Wind-farm Project
#706of 1084 in China#912of 1459 in CDM (UNFCCC)#936of 1287 in ACM0002
Audit Analysis
A 45 MW CDM wind project in China with VVB-confirmed additionality and a standard grid-emission-factor baseline, but undermined by ten material findings, twelve corrective actions, and five cross-document contradictions affecting the baseline method, leakage justification, additionality test type, claimed ERR, and crediting period dates. The absence of a verified ERR figure, FNRB data, and usage-rate information leaves the credit quantity and safety margin unverifiable from the available record.
Red Flags
- Ten material findings and twelve corrective actions in the validation/monitoring record, including meter-sharing deficiencies with a neighbouring project (Yangjiayao II / Project B) and undefined export/import electricity parameters
- Five contradictions across documents on baseline method, leakage justification, additionality test type, claimed ERR, and crediting-period dates, indicating inconsistent project documentation
- No verified ERR figure (total_err_verified not found in any document), making it impossible to confirm whether claimed credits were independently validated
- Grid emission factor of 0.98768 tCO₂/MWh is anchored to 2005 data; while fixed for the crediting period under CDM rules, the age of the reference year warrants scrutiny
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 103,514 | 0 | 103,514 | |
| 2011 | 82,999 | 0 | 82,999 | |
| Total | 186,513 | 0 | 186,513 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justification inconsistent across docs
Grid EF 2005, method label contradicted
Mentioned but FPIC and grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →