Audit Analysis
A 10 MWp grid-connected solar PV project under CDM with a standard jurisdictional baseline and VVB-confirmed investment additionality test. The validation report identified eight material findings requiring corrective action, including non-conservative emission calculations and outdated tools, which were subsequently addressed. No monitoring or verification reports were available in the extracted record, limiting the ability to confirm actual delivery against the claimed 64,890 tCO₂e.
Red Flags
- Eight material findings in the validation report, including non-conservative emission reduction calculations (CAR-3) and use of an outdated emission-factor calculation tool (CAR-5), indicate the initial PDD had significant methodological weaknesses
- No monitoring reports or verification reports were found in the extracted record, so actual emission reductions could not be confirmed against the 64,890 tCO₂e claimed over the 2011–2018 crediting period
- Grid emission factor of 0.8141 tCO₂/MWh is anchored to 2010 data; no baseline reassessment or updated grid EF is documented for the remainder of the crediting period
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for grid solar
Jurisdictional EF (2010), no reassessment documented
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →