Huadian Shangyi Wangyueliang Phase I Wind Farm Project
#1040of 1935 in Renewable energy#579of 1084 in China#777of 1459 in CDM (UNFCCC)#820of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with a jurisdictional baseline and VVB-verified additionality, but the validation report lists 14 substantive corrective actions—particularly around the investment analysis and IRR calculation—indicating a weaker-than-ideal additionality case at approval. No monitoring data, verified ERR, or safeguards detail (FPIC, grievance mechanism) were found in the extracted record, and a seven-fold discrepancy in the claimed ERR between the PDD and the validation report raises data-reliability concerns.
Red Flags
- Seven-fold discrepancy in claimed ERR: the PDD (Oct 2012) states 641,732 tCO₂e while the validation report (Nov 2012) states 91,676 tCO₂e; the validation report figure is privileged as the more recent and authoritative approval document, but the gap signals a data-quality problem.
- Fourteen corrective actions were required at validation, including multiple items demanding revision of the additionality demonstration, IRR sensitivity analysis, and grid-emission-factor parameter completeness—indicating the PDD had material gaps before approval.
- No monitoring period, verified ERR, or usage-monitoring method was found in any available document, so actual delivery cannot be assessed against the ex-ante claim.
- Safeguards are mentioned in the PDD but no FPIC process, grievance mechanism, or stakeholder-engagement detail is documented.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified but 14 corrective actions on investment analysis
Wind-avoidance project, no reversal risk
0% deduction, justified as negligible for grid-connected wind
Jurisdictional baseline, grid EF 0.8958 (2011)
Mentioned in PDD but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →