Huadian Sichuan Shangtongba Hydropower Project

CDM-7449 ↗

#446of 1935 in Renewable energy#181of 1084 in China#293of 1459 in CDM (UNFCCC)#335of 1287 in ACM0002

5.9/ 10
Integrity
7.0
Transparency
4.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

A CDM hydropower project in Sichuan, China, displacing grid electricity with a jurisdictional baseline and a VVB-confirmed combined additionality test. The project is an avoidance-type credit with no inherent reversal risk, and the 0% leakage deduction is reasonable for grid displacement. However, the available record lacks any monitoring or verification data, and several key operational parameters remain unstated, limiting confidence in the ongoing performance claims.

Red Flags

  • No monitoring report or verified ERR figure is present in the extracted record; the only ERR data are the claimed annual (840,465 tCO₂e) and lifetime (5,883,255 tCO₂e) figures from the validation and PDD documents.
  • The grid emission factor of 0.7707 tCO₂/MWh is anchored to 2010 data; no updated or reassessed grid factor is documented for the full 2014–2021 crediting period.
  • Two corrective actions (Letters of Approval from the Chinese and Dutch DNAs) were still open at the time of the validation report, indicating the approval chain was not fully closed at validation.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversal risk

Leakage

0% justified as negligible

Baseline

Jurisdictional grid baseline

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents