Huadian Tieling Lijiatun Wind Farm Project
#516of 1935 in Renewable energy#227of 1084 in China#345of 1459 in CDM (UNFCCC)#390of 1287 in ACM0002
Audit Analysis
A standard CDM wind energy project (ACM0002) with a well-verified additionality assessment and a defensible jurisdictional grid baseline. However, the available record contains no monitoring reports, no verified emissions reductions, and several key operational fields are absent, limiting the ability to confirm actual delivery. The project's crediting period ended in June 2019, and the documentation is over a decade old.
Red Flags
- No monitoring reports or verified emissions reductions found in the extracted record — actual delivery cannot be confirmed
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- Crediting period ended June 2019; no post-crediting-period data or closure report is present
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Wind generation – no reversal risk
0% with negligible justification
Jurisdictional grid EF (2010)
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →