Hung Hai Gia Lai Wind Power Project
GS-3911 ↗ · current registry ID: GS11983
#94of 1935 in Renewable energy#7of 80 in Vietnam#32of 1801 in Gold Standard (GS)#63of 1287 in ACM0002
Audit Analysis
The Hung Hai Gia Lai Wind Power Project is a Gold Standard wind avoidance project with VVB-confirmed additionality and no reversal risk, supported by a jurisdictional baseline. The verified emissions reductions exactly match the claimed figure, and the project delivered approximately 125% of the pro-rata lifetime expectation for the 2024 monitoring period. However, four material findings, five corrective actions, and two inter-document contradictions (baseline method and leakage justification) moderate confidence in the overall data quality.
Red Flags
- Contradiction between the verification report (jurisdictional baseline) and the validation report (project-specific baseline) on the baseline method
- Contradiction between the verification report (leakage deemed negligible) and the monitoring report (leakage quantified) on leakage treatment
- Four material findings and five corrective actions remain open, including inconsistent project design certification dates and missing meter calibration details
- FPIC was not conducted, which is a gap for a community-adjacent wind project in Vietnam
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 340 | 0 | 340 | |
| 2023 | 66,473 | 0 | 66,473 | |
| 2024 | 173,711 | 0 | 173,711 | |
| 2025 | 48,485 | 0 | 48,485 | |
| Total | 289,009 | 0 | 289,009 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, contradiction in justification
Jurisdictional per VR, contradicted by validation report
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →