HUOSHENGYUAN COMPOSTING PROJECT IN MIANYANG CITY
#6of 204 in China#6of 629 in Verra (VCS)#2of 12 in AMS-III.F
Audit Analysis
This is a registry-grade VCS project with a public validation report, validation deed, and monitoring report evidence, so confidence is relatively high. The main residual concerns are claim safety and integrity nuances around manure composting additionality and methane baseline assumptions, but the audited documentation is fairly complete.
Red Flags
- No evidence of CCP approval, Article 6 authorization, or corresponding adjustment in the provided documents.
- The excerpt does not show the detailed leakage calculation or whether any leakage deduction was applied.
- The excerpt does not provide the full additionality test results, only the VVB conclusion that it was reasonable.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 10,010 | 8,628 | 1,382 | |
| 2023 | 5,000 | 0 | 5,000 | |
| Total | 15,010 | 8,628 | 6,382 |
Risk Indicators
validated, but detailed test results not shown in excerpt
not a forestry project, but long-term manure diversion and p
leakage treatment not visible in the provided excerpt
baseline and methodology were validated by CTI
site visit, stakeholder interviews, and EIA/approval referen
registry controls likely help, but no claim authorization ev
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →