Skip to main content
VCSLivestock, enteric fermentation, and manure management; Waste handling and disposalChina Registry: RegisteredAMS-III.F

HUOSHENGYUAN COMPOSTING PROJECT IN MIANYANG CITY

VCS-4675 ↗

#6of 204 in China#6of 629 in Verra (VCS)#2of 12 in AMS-III.F

7.4/ 10
Integrity
7.1
Transparency
8.2
Claim Safety
6.4
Documentation
8.7

Audit Analysis

This is a registry-grade VCS project with a public validation report, validation deed, and monitoring report evidence, so confidence is relatively high. The main residual concerns are claim safety and integrity nuances around manure composting additionality and methane baseline assumptions, but the audited documentation is fairly complete.

Red Flags

  • No evidence of CCP approval, Article 6 authorization, or corresponding adjustment in the provided documents.
  • The excerpt does not show the detailed leakage calculation or whether any leakage deduction was applied.
  • The excerpt does not provide the full additionality test results, only the VVB conclusion that it was reasonable.

Credit Vintages

IssuedRetiredAvailable
2022
10,0108,6281,382
2023
5,00005,000
Total15,0108,6286,382

Risk Indicators

Additionality

validated, but detailed test results not shown in excerpt

Permanence

not a forestry project, but long-term manure diversion and p

Leakage

leakage treatment not visible in the provided excerpt

Baseline

baseline and methodology were validated by CTI

Safeguards

site visit, stakeholder interviews, and EIA/approval referen

Double-claim

registry controls likely help, but no claim authorization ev

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-04-08AMS-III.F, AMS-III.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents