Skip to main content
GSOtherIndiaACM0002

Hybrid (Solar+Wind) Power project by SBE Renewables, Rajasthan

GS-2565 ↗ · current registry ID: GS7720

#664of 975 in India#1073of 1801 in Gold Standard (GS)#988of 1287 in ACM0002

4.8/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A hybrid solar-and-wind renewable energy project in Rajasthan with VVB-confirmed additionality and inherently low reversal/leakage risk, but undermined by a high volume of material findings (11) and corrective actions (19) in the verification report, a baseline-method contradiction between documents, and several data gaps. The project delivered roughly 115% of its pro-rata annual expectation, which is within a reasonable range for a generation project, but the documentation quality issues and unresolved baseline ambiguity limit confidence in the credit's robustness.

Red Flags

  • Eleven material findings (5 concerns + 6 corrective actions) in the verification report, including inconsistent ownership documentation, missing project boundary, missing generation evidence, and incorrect SDG impact calculations
  • Baseline method contradiction: the verification report (Oct 2024) records a project-specific baseline while the monitoring report (Sep 2024) references a jurisdictional baseline; a corrective action also calls for applying the CEA baseline database v16, suggesting the correct method may not yet be in place
  • Nineteen corrective actions remain open, including submission of commissioning certificates, PPA/legal ownership documents, IRR sheet for financial additionality, and a declaration confirming no double counting of credits
  • No buffer pool percentage, permanence claim duration, or FNRB value is stated in any available document

Credit Vintages

IssuedRetiredAvailable
2022
90,2175390,164
2023
1,335,077671,335,010
Total1,425,2941201,425,174

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Generation project, no reversal risk

Leakage

0% deemed negligible, appropriate for RE

Baseline

Method contradiction, CEA v16 not yet applied

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents