Hydro Power Project In Backward District Of Andhra Pradesh, India
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB using a barrier test (validation report).
missing Leakage is not addressed and no leakage deduction is stated in the extracted record (monitoring/validation documentation).
Transparency
verified Claimed and verified ERs match in the extracted record for the monitoring period (monitoring report, 2021).
missing Inconsistent ER totals across validation reports reduce MRV clarity and comparability over time.
Claim Safety
verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk (registry/monitoring record).
missing Contradictory ER figures across documents increase over-crediting/greenwashing risk for external claims.
Documentation
verified Multiple document types are available (monitoring report, validation report, PDD) with high extraction confidence and 9 documents used.
missing Safeguards and grievance information is inconsistent across documents, indicating documentation quality issues.
Detailed Analysis
Integrity
The validation documentation confirms additionality through a barrier analysis and indicates it was confirmed by the VVB (validation report). The baseline is project-specific under ACM0002, and the extracted record does not show when the baseline was last reassessed (PDD/monitoring record). Leakage is a key gap: the monitoring/validation documentation does not address leakage and no leakage deduction is stated, which weakens integrity for an avoidance crediting claim.
Transparency
The monitoring period is clearly stated as 2014-01-01 to 2018-08-17, and the extracted record shows the same total for claimed and verified ERs (683,638) in the monitoring report (2021). The VVB is identified (KBS Certification Services Pvt. Ltd.), supporting audit traceability. However, conflicting ER totals across validation reports reduce transparency on what quantity is ultimately supported by the documentation set.
Claim Safety
The project is marked as not CORSIA-eligible, which lowers the risk of higher-stakes aviation-related claims (registry/monitoring record). At the same time, the ER totals differ materially between document versions, which increases the risk that public claims could reference an inflated number. CCP status is not found in the extracted record, leaving uncertainty for high-integrity label claims.
Documentation
Documentation coverage is relatively strong: 9 documents were used and extraction confidence is high, with core document types present (monitoring report, validation report, PDD). No material findings or corrective actions are reported in the extracted record, which supports procedural completeness. Still, safeguards and grievance mechanism statements conflict between older and newer documents, indicating inconsistent disclosure quality.
Overall
Key contradictions affect reliability: (1) ER totals differ between the 2014 validation report (844,571) and the 2021 validation report (683,638) for both claimed and verified ERs; I privilege the more recent 2021 validation report value (683,638) because it is later-dated and aligns with the 2021 monitoring record, but the discrepancy warrants a score penalty. (2) Safeguards are mentioned in the 2021 monitoring report but not in the 2014 monitoring report; I treat safeguards as partially documented rather than fully robust. (3) A grievance mechanism is stated in the 2021 validation report but not present in the 2014 monitoring report; I do not treat this as fully implemented without consistent monitoring evidence. These inconsistencies, plus leakage not being addressed, keep the overall score in the moderate range.
Audit Analysis
This VCS hydropower project has VVB-confirmed additionality (barrier test) and no reported material findings or corrective actions in the extracted record. However, leakage is not addressed and key figures (verified/claimed ERs) conflict across documents, which raises reliability and over-crediting concerns despite generally solid documentation coverage.
Project Description
APGENCO's project involves the installation of six hydroelectric units, each with a capacity of 39 MW, on an existing reservoir without increasing its volume or flooded area. The project will generate emission reductions by replacing electricity generation from grid connected fossil fuel-fired power plants. The total installed capacity of the plant will be 234 MW, and the power generated will be exported to AP State grid.
Red Flags
- Conflicting ER totals across validation reports (683,638 vs 844,571) undermine confidence in the credited volume
- Leakage is not addressed and no leakage deduction is stated, leaving a key integrity element unresolved
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 59,191 | 59,191 | 0 | |
| 2009 | 169,155 | 169,155 | 0 | |
| 2010 | 66,496 | 66,496 | 0 | |
| 2011 | 182,458 | 182,458 | 0 | |
| 2012 | 126,338 | 126,338 | 0 | |
| 2013 | 239,316 | 239,316 | 0 | |
| 2014 | 683,638 | 683,638 | 0 | |
| Total | 1,526,592 | 1,526,592 | 0 |
Cosa migliorerebbe questo punteggio
- Provide a clear leakage assessment consistent with ACM0002 (including whether leakage is negligible and why) and state any leakage deduction applied.
- Publish a reconciliation note explaining why ER totals changed between the 2014 and 2021 validation reports (e.g., updated grid EF, eligibility filters, or corrections) and ensure safeguards/grievance disclosures are consistent across monitoring and validation documents.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed barrier test
Avoidance project; no reversal events reported
Leakage not addressed; deduction not stated
Project-specific baseline; reassessment timing unclear
Safeguards/grievance inconsistently documented
Not CORSIA-eligible; CCP status not found
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →