Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Colombia Registry: RegisteredACM0002

Hydroelectric Project MULATOS II

VCS-1473 ↗

#74of 1935 in Renewable energy#1of 124 in Colombia#19of 1339 in Verra (VCS)#49of 1287 in ACM0002

6.8/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
6.5

Audit Analysis

MULATOS II is a small hydroelectric project in Colombia that replaces grid electricity, with a jurisdictional baseline and VVB-confirmed combined additionality test. The project delivered approximately 88% of its pro-rata ex-ante expectation for the first monitoring period, which is within a reasonable range. Several material findings (capacity discrepancies, calibration frequency, start-date deviation) were identified and corrective actions are in progress, but no fundamental design flaws were reported.

Red Flags

  • Installed capacity values in the registered PDD differed from actual turbine/generator nameplates; corrected in PD v3.0 to 7.34 MW, but the discrepancy raises questions about whether earlier credit calculations used the correct capacity.
  • Grid emission factor is from 2014 (0.4361 tCO2/MWh); no evidence of an updated or more recent national grid factor was found in the extracted record.
  • Leakage justification is inconsistent between the verification report ('quantified') and the monitoring report ('deemed negligible'), both from 2022, with a 0% deduction in both cases.

Credit Vintages Exhausted

IssuedRetiredAvailable
2019
5,3725,3720
2020
13,98513,9850
2021
20,22020,2200
Total39,57739,5770

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification inconsistent across docs

Baseline

Jurisdictional, per 2022 verification

Safeguards

Grievance mechanism present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents