Hydroelectric Project PCH Luzma
#970of 1935 in Renewable energy#47of 124 in Colombia#600of 1339 in Verra (VCS)#763of 1287 in ACM0002
Audit Analysis
PCH Luzma is a small-scale hydro project in Colombia with a VVB-confirmed combined additionality test and no reversal events, but its integrity is undermined by a baseline-method contradiction between the verification and monitoring reports, a 0% leakage deduction justified only as 'deemed negligible,' and three material findings related to Colombian Resolution 1447 conformance. The low extraction confidence and ten cross-document contradictions further erode confidence in the data record.
Red Flags
- Baseline method is stated as 'project' in the 2026 verification report but 'jurisdictional' in the 2025 monitoring report — a fundamental discrepancy that affects credit validity
- Three material findings and two corrective actions relate to conformance with Colombian Resolution 1447 (Articles 34-39) and VVB eligibility for post-December 2018 verification
- Leakage deduction is 0% with justification shifting from 'quantified' (2021 verification) to 'deemed negligible' (2026 verification), weakening the leakage treatment over time
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 17,632 | 17,632 | 0 | |
| 2018 | 85,273 | 76,931 | 8,342 | |
| 2019 | 78,791 | 78,791 | 0 | |
| 2020 | 72,868 | 35,907 | 36,961 | |
| 2021 | 87,475 | 0 | 87,475 | |
| 2022 | 80,522 | 0 | 80,522 | |
| 2023 | 65,144 | 0 | 65,144 | |
| 2024 | 6,740 | 0 | 6,740 | |
| Total | 494,445 | 209,261 | 285,184 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversals
0% deduction, 'deemed negligible'
Project-specific, method contradicted
FPIC & grievance confirmed 2026, absent 2014
CORSIA excluded, CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →