İncesu WEPP
#1445of 1935 in Renewable energy#34of 75 in TR#63of 154 in Intl. Carbon Registry (ICR)#1109of 1287 in ACM0002
Audit Analysis
The İncesu WEPP is a wind energy avoidance project under the ICR registry using the well-established ACM0002 V22 methodology with a jurisdictional grid-emission-factor baseline. The project is in its very early stage (PDD submitted June 2025, crediting period starting March 2025), so the absence of verification reports, monitoring data, and VVB confirmation is expected but leaves significant evidence gaps. Safeguards documentation (FPIC, grievance mechanism, benefit sharing) is a positive, and the avoidance-type credit carries no reversal risk.
Red Flags
- No VVB name or verification report found in the extracted record; additionality test is described in the PDD but not independently confirmed
- No monitoring period, verified ERR, or FNRB data available — the 368,440 tCO2e lifetime claim rests entirely on the ex-ante PDD estimate with no independent validation
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel or double-claiming risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2025 | 34,168 | 0 | 34,168 | |
| 2026 | 37,339 | 0 | 37,339 | |
| 2027 | 37,339 | 0 | 37,339 | |
| 2028 | 37,339 | 0 | 37,339 | |
| 2029 | 37,339 | 0 | 37,339 | |
| 2030 | 37,339 | 0 | 37,339 | |
| 2031 | 37,339 | 0 | 37,339 | |
| 2032 | 37,339 | 0 | 37,339 | |
| 2033 | 37,339 | 0 | 37,339 | |
| 2034 | 37,339 | 0 | 37,339 | |
| 2035 | 3,171 | 0 | 3,171 | |
| Total | 373,390 | 0 | 373,390 |
Risk Indicators
Combined test in PDD, no VVB confirmation
Avoidance type, irreversible, no reversals
0% deemed negligible, consistent with wind
Jurisdictional grid EF, no reassessment data
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →