Skip to main content
VCSAgriculture Forestry and Other Land UseParaguay Registry: RegisteredAR-ACM0003

IMPACT REFORESTATION IN THE CHACO PROJECT

VCS-2496 ↗

#245of 261 in Soil carbon#8of 8 in Paraguay#1303of 1339 in Verra (VCS)#94of 97 in AR-ACM0003

2.6/ 10
Integrity
2.0
Transparency
3.0
Claim Safety
3.0
Documentation
3.0

Audit Analysis

The Impact Reforestation in the Chaco Project carries severe integrity concerns: the VVB disclaimed its validation opinion citing insufficient evidence, additionality was not confirmed by the VVB, and material findings were described as 'material and pervasive.' No verified monitoring data exists, the ERR figures show an eight-fold discrepancy between PDD revisions, and the project-specific baseline with a zero leakage deduction in a Chaco context raises over-crediting risk. Despite a 14% buffer pool and no reported reversal events, the overall evidentiary foundation is too weak to support confidence in the claimed credits.

Red Flags

  • VVB disclaimed issuance of a validation opinion due to insufficient evidence; the project proponent terminated the contract before the audit was completed
  • Additionality was NOT verified by the VVB (most recent validation report, March 2024), despite a combined test being described in the PDD
  • Material findings described as 'material and pervasive' with 35 CCB indicators unresolved at the time of contract termination
  • Eight-fold discrepancy in lifetime ERR between PDD revisions (7,538 tCO₂e in 2023 vs 59,728 tCO₂e in 2021) with no verified monitoring data to anchor the claim
  • Zero leakage deduction justified only as 'deemed negligible' for a reforestation project in the Chaco, a region with documented land-use pressure

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB disclaimed opinion; additionality not confirmed

Permanence

14% buffer pool, no reversals, but VVB disclaimer

Leakage

0% deduction, 'deemed negligible' in Chaco context

Baseline

Project-specific; reassessment not yet due (10-yr rule)

Safeguards

FPIC and grievance present; 35 CCB indicators unresolved

Double-claim

CORSIA not stated; CCP not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AR-ACM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents