India One Solar Thermal Power Project
GS-176 ↗ · current registry ID: GS1304
#69of 975 in India#51of 1801 in Gold Standard (GS)#8of 44 in AMS-I.F
Audit Analysis
A small solar thermal electricity project in India registered under Gold Standard, displacing grid electricity with a jurisdictional baseline. The verification report confirms the claimed emissions reductions for the first monitoring period, and all material findings were resolved. Key gaps include the absence of a buffer pool, unconfirmed VVB additionality verification, and unresolved contradictions between the PDD and verification report on baseline method and leakage treatment.
Red Flags
- Contradiction between PDD (2017) and verification report (2020) on baseline method: PDD describes a project-specific baseline while the verification report classifies it as jurisdictional — the more recent verification report is privileged, but the inconsistency raises questions about baseline robustness
- Contradiction on leakage: PDD (2017) references a quantified leakage assessment while the verification report (2020) states leakage is deemed negligible with a 0% deduction — the verification report is privileged, but the shift in treatment is unexplained
- Additionality test (common practice) is identified but explicit VVB confirmation of the additionality assessment is not found in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 350 | 0 | 350 | |
| 2019 | 690 | 0 | 690 | |
| Total | 1,040 | 0 | 1,040 |
Risk Indicators
Common-practice test present but VVB confirmation not found in record
mixed evidence / unresolved risk
0% deduction deemed negligible; PDD/VR contradiction on treatment
Jurisdictional per VR but PDD says project-specific; no reassessment date
Safeguards and grievance mechanism mentioned; FPIC not stated
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →