InfraVest Guanyin Wind Farm Project - Taiwan
GS-1077 ↗ · current registry ID: GS612
#315of 1935 in Renewable energy#1of 6 in Taiwan#134of 1801 in Gold Standard (GS)#236of 1287 in ACM0002
Audit Analysis
The Guanyin Wind Farm is a Gold Standard renewable energy project with a VVB-confirmed combined additionality test and a jurisdictional baseline, but it is undermined by a grid emission factor drawn from 2007 data, an unstated buffer pool, and recurring data-quality issues (multiple CARs and CLs across monitoring periods). The project delivered roughly 58% of its pro-rata ex-ante expectation for the monitored year, which is conservative and reduces over-crediting risk, yet several contradictions across documents (baseline characterisation, lifetime ERR, grid EF) and the absence of CORSIA/CCP status create residual uncertainty.
Red Flags
- Grid emission factor of 0.66 tCO2/MWh is sourced from 2007 data (PDD, 2011) and has not been updated to reflect Taiwan's current grid mix, potentially overstating or understating abatement per MWh.
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified despite reversal events being listed as 'not addressed.'
- The baseline is characterised as 'jurisdictional' in the 2021 verification report but as 'project-specific' in the 2020 verification report — an unresolved contradiction that affects baseline credibility.
- Multiple Corrective Action Requests and Clarification Requests across at least three monitoring cycles (2011, 2012, 2021) indicate persistent data-quality and record-keeping weaknesses.
- CORSIA eligibility and CCP status are not stated in any extracted document, leaving dual-channel or double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 64,724 | 64,724 | 0 | |
| 2011 | 97,002 | 97,002 | 0 | |
| 2012 | 90,312 | 90,312 | 0 | |
| 2013 | 100,714 | 100,714 | 0 | |
| 2014 | 89,785 | 89,785 | 0 | |
| 2015 | 95,370 | 95,370 | 0 | |
| 2016 | 88,985 | 88,912 | 73 | |
| 2017 | 39,857 | 39,600 | 257 | |
| 2018 | 77,571 | 71,224 | 6,347 | |
| 2019 | 75,243 | 75,243 | 0 | |
| 2020 | 55,134 | 36,399 | 18,735 | |
| Total | 874,697 | 849,285 | 25,412 |
Risk Indicators
VVB-confirmed combined test
Avoidance project; reversal not addressed
0% deduction, justified as negligible for wind
Jurisdictional per 2021 VR but contradicted by 2020 VR; grid EF from 2007
FPIC, grievance mechanism, benefit sharing all documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →