Skip to main content
GSWindTaiwanACM0002

InfraVest Taiwan Wind Farms Bundled Project 2012

GS-208 ↗ · current registry ID: GS1350

#1548of 1935 in Renewable energy#6of 6 in Taiwan#1577of 1801 in Gold Standard (GS)#1181of 1287 in ACM0002

4.1/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
4.0
Documentation
5.0

Audit Analysis

A bundled Taiwan wind farm project under Gold Standard with a jurisdictional baseline and low inherent permanence risk, but severely undermined by 18 material findings, a 30% reduction in verified emissions reductions after corrections, and a contradictory additionality verification record. The project delivered only about 62% of its pro-rata ex-ante expectation for the monitored period, and multiple documentation gaps (grid emission factor inconsistency, outdated methodology, missing PDD elements) raise meaningful over-crediting concerns.

Red Flags

  • 18 material findings in the 2021 verification report, including a 17.69% under-delivery of verified reductions versus estimates, grid emission factor inconsistency in the PDD, and the Chubei Wind Farm being sold and excluded from the project design mid-crediting-period
  • Additionality verification by the VVB is contradictory across reports: the 2018 verification report confirms it, but the more recent 2019 verification report does not, leaving the additionality claim unconfirmed
  • Verified emissions reductions dropped from 80,558 tCO2e (2020 verification) to 56,027 tCO2e (2021 verification) after corrective actions, a 30% reduction that signals the initial claims were overstated
  • Five corrective actions remain required, including correcting installed capacity, adding missing meter data, updating emission factors, and revising the PDD to exclude the Chubei Wind Farm

Credit Vintages

IssuedRetiredAvailable
2016
58,16858,1680
2017
64,20564,2050
2018
71,69971,6990
2019
80,55879,2221,336
2020
56,02756,0270
Total330,657329,3211,336

Risk Indicators

Additionality

Combined test present but VVB verification unconfirmed (2019 VR)

Permanence

Wind project, no reversal events, low inherent risk

Leakage

0% deemed negligible, appropriate for onshore wind

Baseline

Jurisdictional per 2021 VR, but contradicted by 2020 VR; reassessment timing not stated

Safeguards

Grievance mechanism and benefit sharing present; FPIC not stated; Do No Harm assessment flawed

Double-claim

CCP and CORSIA status both not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents