InfraVest Taiwan Wind Farms Bundled Project 2012
GS-208 ↗ · current registry ID: GS1350
#1548of 1935 in Renewable energy#6of 6 in Taiwan#1577of 1801 in Gold Standard (GS)#1181of 1287 in ACM0002
Audit Analysis
A bundled Taiwan wind farm project under Gold Standard with a jurisdictional baseline and low inherent permanence risk, but severely undermined by 18 material findings, a 30% reduction in verified emissions reductions after corrections, and a contradictory additionality verification record. The project delivered only about 62% of its pro-rata ex-ante expectation for the monitored period, and multiple documentation gaps (grid emission factor inconsistency, outdated methodology, missing PDD elements) raise meaningful over-crediting concerns.
Red Flags
- 18 material findings in the 2021 verification report, including a 17.69% under-delivery of verified reductions versus estimates, grid emission factor inconsistency in the PDD, and the Chubei Wind Farm being sold and excluded from the project design mid-crediting-period
- Additionality verification by the VVB is contradictory across reports: the 2018 verification report confirms it, but the more recent 2019 verification report does not, leaving the additionality claim unconfirmed
- Verified emissions reductions dropped from 80,558 tCO2e (2020 verification) to 56,027 tCO2e (2021 verification) after corrective actions, a 30% reduction that signals the initial claims were overstated
- Five corrective actions remain required, including correcting installed capacity, adding missing meter data, updating emission factors, and revising the PDD to exclude the Chubei Wind Farm
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 58,168 | 58,168 | 0 | |
| 2017 | 64,205 | 64,205 | 0 | |
| 2018 | 71,699 | 71,699 | 0 | |
| 2019 | 80,558 | 79,222 | 1,336 | |
| 2020 | 56,027 | 56,027 | 0 | |
| Total | 330,657 | 329,321 | 1,336 |
Risk Indicators
Combined test present but VVB verification unconfirmed (2019 VR)
Wind project, no reversal events, low inherent risk
0% deemed negligible, appropriate for onshore wind
Jurisdictional per 2021 VR, but contradicted by 2020 VR; reassessment timing not stated
Grievance mechanism and benefit sharing present; FPIC not stated; Do No Harm assessment flawed
CCP and CORSIA status both not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →