Re-assessment pending
Inner Mongolia Bayannaoer Chuanjingsumu 49.3MW Wind Power Project
Inner Mongolia Bayannaoer Chuanjingsumu 49.3MW Wind Power Project (VCS-396) is being re-assessed under the current CarbonMeld methodology (v3): its earlier rating came from an older version of the method and is no longer shown, so this page gives no CarbonMeld rating until the new analysis is published.
Assessment
Being reassessed under the current method
The earlier analysis of this project used an older version of our method, so its rating is no longer shown: it is not comparable with ratings under the current method (v3). The new analysis will appear here once it is published; until then, this page shows the project's registry data.
Standard and methodology
Evidence
Eligibility & market
What can you claim with this credit?
Four checks buyers ask about, from the registry and the Integrity Council (ICVCM).
Airlines (CORSIA)
No CORSIA label on the registry
Not usable for airlines' CORSIA obligations.
Source: registry label · read on 12 Nov 2026
Covers: this project's credit records as read on the registry
Integrity label (ICVCM CCP)
Methodology not approved by ICVCMACM0002
The Integrity Council assessed this methodology as not meeting the Core Carbon Principles.
Source: ICVCM assessment · ICVCM table read on 4 Nov 2026
Covers: the methodology (every project using it), not this project's credits
Removal or reduction
Emission reduction or avoidance
Prevents or reduces emissions — fits contribution claims, not SBTi neutralisation.
Source: project sector
Covers: the project type, not a label on individual credits
Paris Agreement (Article 6)
No Article 6 authorization
No corresponding adjustment: the host country can also count this reduction towards its own target.
Source: registry label · read on 12 Nov 2026
Covers: this project's credit records as read on the registry
Information only, from public sources. Claim rules (CORSIA, SBTi, EU rules on green claims) change: check them before making a public claim. Since 27 September 2026, EU consumer rules do not allow “climate neutral” product claims based on offsets.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 131,375 | 131,375 | 0 | |
| 2009 | 21,763 | 21,763 | 0 | |
| 2012 | 71,430 | 13,541 | 57,889 | |
| 2017 | 56,415 | 0 | 56,415 | |
| Total | 280,983 | 166,679 | 114,304 |
Methodology versions used
The methodology version stated in each monitoring, verification and issuance document, by period, compared with the official methodology pages.
2007–2009ACM0002version not confirmed in the document text
monitoring report
2012–2017ACM0002 v6.0since replaced by v22.0
monitoring report + verification report
official page · verified on
- ACM0002: Active (CDM / UNFCCC) · official page · verified on
A version is shown only when the document's own text writes it next to the methodology code. Current versions, status and CCP ranges come from the official pages linked, checked on the date shown.
Retired by
- Neutralize GHG emissions generated during the construction phase of CEVIA Enviro R&D Center on behalf of Henan Workman Construction Engineering Co., LTD2,213 t
- The GHG emissions generated from the 18th World Chinese Entrepreneurs Convention(WCEC) on November 2 to 42,000 t
- The GHG emissions generated from the 2026 International Cities of Gastronomy Fest Macao on March 20 to 29896 t
- The GHG emissions generated from the 14th Macao International Travel (Industry) Expo on April 10 to April 12812 t
- The GHG emissions generated from the 2025 Light Up Macao on December 6, 2025 to January 11810 t
- The GHG emissions generated from the 2026MIECF March 26 to 28520 t
- The GHG emissions generated from the Parade for Celebration of the Year of the Horse on February 19 to March 8427 t
- CREATION ADVERTISING CO.LTD320 t
- 2024 GHG Emission Offset for Shandong LEAD CNC Machinery Co., Ltd246 t
- 北京首钢股份有限公司171 t
Organisations named as beneficiaries in the registry's public retirement records. (+12)
Where to buy
Got an offer for these credits? Check it against the registry →
+ Know where to buy this?
Listing multiple projects? Send us a CSV at listings@carbonmeld.com.
Profile & governance
Are you the project owner?
Full analysis (free for owners)
Owners get free access to the full analysis of their own project: every rule that raised or lowered the number, with the fact and the source it rests on, the negative facts' detail and the documents read. Write to us from your organisation's email address.
hello@carbonmeld.com →Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the rating.
hello@carbonmeld.com →Report an error on this page
Something wrong in the analysis, or a registry document we have not used? Send us the link to the public source: you get a reference and an answer within 30 days.
Report an error on this page →Cite this page
CarbonMeld (2026). Inner Mongolia Bayannaoer Chuanjingsumu 49.3MW Wind Power Project (VCS-396): registry data. https://carbonmeld.com/projects/inner-mongolia-bayannaoer-chuanjingsumu-49-3mw-wind-power-project-vcs-396/.
The citation names the registry data this page shows; the page gives no CarbonMeld rating.
Records with the same name in other registries
Records in another registry with the same name, country and methodology. Each has its own credits, documents and rating.
- Inner Mongolia Bayannaoer Chuanjingsumu 49.3MW Wind Power ProjectClean Development Mechanism · CDM-1621
Similar projects
Same methodology or sector, the same registry first.
- Jiangsu Qidong Dongyuan Wind Power ProjectVCS-421
- Gansu Guazhou Xiangyang Phase II Wind Power ProjectVCS-716
- Wind Based Power Generation by Panama Wind Energy Godawari Private Limited, Pune in the State of Maharashtra, IndiaVCS-1523
- Jilin Tongyu Tongfa Wind Power ProjectVCS-276
- Dak Srong 2 Hydropower ProjectVCS-971
- Shenyang Faku Wanghaisi Wind Power ProjectVCS-659
- Liaoning Faku Wanghaisi East Wind Power ProjectVCS-660
- 44 MW Bundled Wind Power Project in Maharashtra managed by Enercon India Limited.VCS-489
