Vai al contenuto principale
VCS Forestry China Vintage 2013 Registry: On Hold - see notification letter Documentazione completa General Methodology v2.0

Inner Mongolia Keyihe IFM (Conversion Of Logged To Protected Forest) Project

VCS-1718 ↗

5.4 / 10
Integrity
6.2
Transparency
5.1
Claim Safety
5.4
Documentation
4.0

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test, which is a meaningful positive signal.

missing The verification report recorded one corrective action request and five clarifications, including a transparency issue in the uncertainty calculation for the project scenario.

Transparency

verified The monitoring period and verified emission reductions are stated, and the record includes a named VVB and a quantified verified total.

missing The extracted record has low extraction confidence, only one evidence document is identified, and the registry status is on hold.

Claim Safety

verified The project is marked as not CORSIA-eligible, which lowers dual-market claim risk.

missing The baseline is project-specific rather than a clearly reassessed standardized baseline, and the record contains unresolved documentation issues around leakage and uncertainty.

Documentation

verified The record includes multiple official-document fields, a named verifier, and a long crediting period with a defined monitoring window.

missing Low extraction confidence, only one evidence document identified, and several contradictions across documents reduce documentation reliability.

Detailed Analysis

Integrity

The project has a stronger-than-average additionality signal because the VVB confirmed an investment test, and the record shows a 22% buffer pool with no reported reversal events. That said, the verification report also lists one corrective action request and five clarifications, including a finding that uncertainty for the improved forest management activities was not calculated in a correct and transparent way, which weakens confidence in the credited amount. Leakage is treated as negligible with a 0% deduction, but the documentation issues keep the integrity score from being higher.

Transparency

The monitoring period is clearly stated and the record includes a quantified verified total of 492,793, with the China Quality Certification Center named as verifier. However, the extracted record has low extraction confidence, the evidence base is thin, and the registry status is on hold, all of which reduce transparency. Public-facing completeness is also limited because several operational details, such as usage monitoring, are not stated in the available documents.

Claim Safety

Claim safety is helped by the fact that the project is marked as not CORSIA-eligible, which reduces the risk of overlapping aviation claims. On the other hand, the baseline is project-specific rather than clearly standardized or recently reassessed, and the record does not provide a robust quantified treatment for several claim-critical items. The leakage treatment is favorable on paper, but the broader documentation weaknesses and corrective actions keep over-crediting risk from looking low.

Documentation

The record contains a substantial number of extracted fields and identifies the verifier, methodology, crediting period, and monitoring period. Even so, the extraction confidence is low, only one evidence document is identified in the structured record, and the project has a long list of unresolved or partially resolved issues. The contradictions on benefit sharing, safeguards, grievance mechanism, FPIC, leakage justification, and reversal treatment further reduce documentation quality.

Overall

Overall, this is a middling-quality forestry project record: there are real positives such as VVB-confirmed additionality, a buffer pool, and no reported reversals, but these are offset by a corrective action request, multiple clarifications, and a transparency concern in the uncertainty calculation. I privileged the later documents in the contradictions because they are more recent and appear to be the higher-priority verification/monitoring evidence, so I treated benefit sharing, safeguards, grievance, FPIC, leakage, and reversal treatment as present where the later documents say so. The registry being on hold and the low extraction confidence materially reduce trust in the file, so the score remains moderate rather than strong.

Audit Analysis

The project has some positive integrity signals, including VVB-confirmed additionality, a buffer pool, and no reported reversals. However, the verification package also contains a CAR and multiple clarifications, and the uncertainty treatment for improved forest management was flagged as not calculated transparently, which weakens confidence in the credited volume. Registry status is on hold, and the low extraction confidence plus document contradictions reduce trust in the record.

Project Description

The Inner Mongolia Keyihe IFM Project is a large-scale conservation initiative in Oroqen Autonomous Banner, China, dedicated to protecting 20,526 hectares of previously logged forests. The project has eliminated commercial logging in the protected area since 2013, enhancing carbon sequestration, biodiversity, and watershed health. This undertaking supports local livelihoods through sustainable alternatives like mushroom harvesting, setting a global model for responsible forest management.

Red Flags

  • The verification report identified one corrective action request and five clarifications, including a concern that uncertainty for the improved forest management activities was not calculated in a correct and transparent way.
  • The registry status is on hold, and the extracted record shows low extraction confidence with contradictions across documents on safeguards, grievance, FPIC, leakage, and reversal treatment.

Credit Vintages

Issued Retired Available
2013
112,863 68,259 44,604
2014
80,632 73,231 7,401
2015
108,047 77,026 31,021
2016
138,724 87,900 50,824
2017
136,048 90,438 45,610
2018
165,007 84,836 80,171
2019
182,940 182,940 0
2020
90,569 89,134 1,435
Total 1,014,830 753,764 261,066

Cosa migliorerebbe questo punteggio

  • Publish a clearer, fully traceable recalculation of uncertainty and credited emissions, with all CAR and clarification items closed.
  • Provide a complete, readable evidence set with consistent safeguard, leakage, and reversal documentation across the verification and monitoring reports.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Buffer pool present, no reversals reported

Leakage

0% deduction with negligible justification

Baseline

Project-specific baseline

Safeguards

FPIC, grievance mechanism, and safeguards documented

Double-claim

Not CORSIA-eligible

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-18 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti