Installation of Household Biogas plants in Punjab - 1
GS-3447 ↗ · current registry ID: GS11426
#65of 268 in Biogas#487of 975 in India#617of 1801 in Gold Standard (GS)#24of 60 in AMS-I.E
Audit Analysis
A household biogas project in Punjab, India, with a verified additionality test and quantified 5% leakage deduction, but undermined by a serious FPIC contradiction between the PDD and the 2025 verification report, an extensive list of 30+ corrective actions indicating significant MRV data-quality problems, and the absence of a stated buffer pool. Pro-rata delivery of roughly 98% of the expected emissions reductions for the elapsed monitoring period suggests no material over-crediting, yet the data-reliability issues and safeguard gaps limit confidence in the overall claim.
Red Flags
- FPIC contradiction: the 2022 PDD states FPIC was conducted, but the 2025 verification report records it as not conducted — the more recent verification document is privileged, indicating a fundamental free, prior, and informed consent gap.
- 30+ corrective actions in the 2025 verification report, including inaccurate ER calculations, incorrect monitoring period, missing sample-size justification, and a technology-description discrepancy (KVIC floating vs. Deenbandhu fixed model), signalling systemic MRV quality problems.
- FNRB method changed from national default (2022 report) to local field measurement (2025 report) without a clear documented justification for the switch.
- Baseline is project-specific and no reassessment date is recorded; while not yet overdue under Gold Standard rules, the absence of a documented reassessment schedule is a gap.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 298 | 298 | 0 | |
| 2021 | 19,465 | 19,465 | 0 | |
| 2022 | 32,540 | 32,540 | 0 | |
| 2023 | 31,932 | 31,932 | 0 | |
| 2024 | 32,021 | 31,412 | 609 | |
| 2025 | 18,776 | 18,776 | 0 | |
| Total | 135,032 | 134,423 | 609 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
5% quantified deduction
Project-specific, no reassessment date recorded
FPIC not conducted per 2025 VR; consultation gaps
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →